CONSTRUCTION MANAGEMENT AGREEMENT

 

 

BETWEEN

 

 

THE NEW YORK TIMES BUILDING, LLC,

 

OWNER,

 

 

and

 

 

AMEC CONSTRUCTION MANAGEMENT, INC.,

 

CONSTRUCTION MANAGER

 



 

TABLE OF CONTENTS

 

ARTICLE 1 DEFINITIONS

 

 

 

ARTICLE 2 GENERAL PROVISIONS

 

 

2.1

RELATIONSHIP OF THE PARTIES

2.2

CONTRACT DOCUMENTS

2.3

CONSTRUCTION MANAGER’S GENERAL OBLIGATIONS

2.4

ETHICAL OBLIGATIONS

2.5

EQUAL OPPORTUNITY

2.6

COOPERATION WITH INTERIOR CONSTRUCTION MANAGER, TRADE CONTRACTORS AND ARCHITECT

 

ARTICLE 3 PRE-CONSTRUCTION PHASE

 

 

3.1

PRE-CONSTRUCTION PHASE SERVICES

 

ARTICLE 4 CONSTRUCTION PHASE

 

 

4.1

PERFORMANCE OF THE WORK

4.2

COORDINATION WITH INTERIORS WORK

4.3

BIDDING PROCESS

4.4

TRADE CONTRACTS

4.5

CONSTRUCTION PHASE SCOPE OF WORK

4.6

WARRANTIES

4.7

COMPLIANCE WITH AFFIRMATIVE ACTION REQUIREMENTS

 

ARTICLE 5 MANAGEMENT OF THE WORK

 

 

5.1

KEY EMPLOYEES

5.2

SUPPORT STAFF

5.3

AUTHORIZED REPRESENTATIVES

 

ARTICLE 6 PAYMENT

 

 

6.1

PHASES

6.2

PAYMENTS

6.3

PAYMENT DOES NOT CONSTITUTE ACCEPTANCE

6.4

INCENTIVE BONUSES

 

ARTICLE 7 GUARANTEED MAXIMUM PRICE

 

 

7.1

GMP

7.2

TRADE CONTRACT COSTS

7.3

GENERAL CONDITIONS COSTS

7.4

CONSTRUCTION CONTINGENCY

7.5

CONSTRUCTION MANAGER ACKNOWLEDGMENT OF INCOMPLETE DESIGN DOCUMENTS

 

ARTICLE 8 COSTS OF THE WORK

 

 

8.1

LIMITATION ON COSTS OF THE WORK

8.2

TRADE CONTRACT COSTS

8.3

GENERAL CONDITIONS COSTS

8.4

BACK-UP DOCUMENTATION

8.5

CONTROL OF COSTS OF THE WORK

 

ii



 

ARTICLE 9 NON-REIMBURSABLE COSTS

 

 

9.1

NON-REIMBURSABLE COSTS

 

ARTICLE 10 CHANGES IN THE WORK

 

 

10.1

CHANGE ORDERS

10.2

MATERIAL CHANGE

10.3

FIELD DIRECTIVE

10.4

EMERGENCY CHANGE ORDER

10.5

FULL PAYMENT FOR CHANGE ORDERS

10.6

BACKCHARGES

10.7

CHANGE ORDER-RELATED TIME EXTENSIONS

 

ARTICLE 11 SCHEDULE OF THE WORK AND OCCUPANCY

 

 

11.1

PROJECT SCHEDULE

11.2

CPM SCHEDULE

11.3

UPDATES TO CPM SCHEDULE

11.4

TIME OF THE ESSENCE

11.5

REQUIREMENTS FOR SUBSTANTIAL COMPLETION

11.6

REQUIREMENTS FOR FINAL COMPLETION

11.7

TIME EXTENSIONS

11.8

COMPENSATION FOR DELAY

11.9

ACCELERATION OF THE WORK

11.10

MODIFICATIONS TO PROJECT SCHEDULE

 

ARTICLE 12 SEPARATE CONTRACTORS

 

 

12.1

OWNER’S RIGHT TO ENGAGE SEPARATE CONTRACTORS

12.2

COOPERATION AND COORDINATION WITH SEPARATE CONTRACTORS

12.3

SEPARATE CONTRACTOR-RELATED SUSPENSIONS

12.4

DAMAGE TO WORK

 

ARTICLE 13 ACCOUNTING RECORDS

 

 

13.1

PROJECT ACCOUNTING RECORDS

13.2

MAINTENANCE OF PROJECT ACCOUNTING BOOKS AND RECORDS

13.3

AUDITS

13.4

PRESERVATION OF PROJECT RECORDS

 

ARTICLE 14 BONDS AND INSURANCE

 

 

14.1

BOND REQUIREMENTS

14.2

INSURANCE REQUIREMENTS

 

ARTICLE 15 HAZARDOUS MATERIALS

 

 

15.1

GENERAL REQUIREMENTS

15.2

HAZARDOUS MATERIALS BROUGHT TO SITE OR GENERATED BY CONSTRUCTION MANAGER AND/OR TRADE CONTRACTORS

15.3

HAZARDOUS MATERIALS IDENTIFIED IN CONTRACT DOCUMENTS

15.4

UNIDENTIFIED HAZARDOUS MATERIALS

 

ARTICLE 16 TERMINATION AND SUSPENSION

 

 

16.1

TERMINATION FOR DEFAULT

16.2

TERMINATION FOR CONVENIENCE

16.3

SUSPENSION

16.4

TERMINATION OF OWNER BY CONSTRUCTION MANAGER

 

iii



 

ARTICLE 17 DISPUTE RESOLUTION

 

 

17.1

LITIGATION

17.2

CONTINUATION OF WORK

17.3

PREVAILING PARTY AT TRIAL

 

ARTICLE 18 MISCELLANEOUS PROVISIONS

 

 

18.1

PRACTICE OF ARCHITECTURE AND/OR ENGINEERING

18.2

EFFECTIVENESS OF AGREEMENT

18.3

SURVIVAL OF OBLIGATIONS

18.4

ASSIGNMENT

18.5

CONFIDENTIALITY

18.6

TRUST ACCOUNT

18.7

NOTICES

18.8

CONSTRUCTION OF LANGUAGE

18.9

CAPTIONS AND TITLES

18.10

NO WAIVER

18.11

INDEMNIFICATION

18.12

SEVERABILITY

18.13

ARCHITECT AND OWNER CONSULTANTS

18.14

RIGHTS AND REMEDIES

18.15

GOVERNING LAW AND CONSENT TO JURISDICTION

18.16

INTERPRETATIONS IN WRITING

18.17

INDEPENDENT CONTRACTOR

18.18

LIMITED RECOURSE

 

iv



 

EXHIBIT A

Project Description

 

 

EXHIBIT B

Trade Contract Form

 

 

EXHIBIT C

Preliminary Schedule

 

 

EXHIBIT D

General Conditions Items

 

 

EXHIBIT E

Not Used

 

 

EXHIBIT F

Preliminary List of Drawings and Specifications

 

 

EXHIBIT G

Affirmative Action Requirements

 

 

EXHIBIT H

Waiver of Lien and Release Forms

 

 

EXHIBIT I

Consultants

 

 

EXHIBIT J

OCIP Manual

 

 

EXHIBIT K

Project Website Guidelines

 

 

EXHIBIT L

Key Employee Affidavit

 

 

EXHIBIT M

Key Employees

 

 

EXHIBIT N

Not Used

 

 

EXHIBIT O

Qualifications and Assumptions


End of Preview